DRIBs-I (Phase #1)

     

  • DRIBs-I accelerator complex (130m long) was designed for production of radioactive ion beams and combines constructively  U400 and U400M cyclotrons. Was put into operation in 2002.
  • DRIBs-I  layout in the FLNR

  • DRIBs-I (Phase #1) : U400M —> U400

The ion beam line for transportation of light radioactive ions (low–energy ~ 15keV) from the RIB separator of the U400M cyclotron to the U400 cyclotron.-Radioactive ions 6,8He, 11Be
 
-Vacuum volume at a pressure of 2•10-7 Torr
-Ion guide with length of 130 meters with inner diameter of 100 mm
-ECR ion source
-53 quadrupole magnetic lenses with gradient of the magnetic field 0.9 T/m
-6 quadrupole magnetic lenses with gradient of the magnetic field 1.7 T/m
-4 magnetic dipoles with magnetic rigidity HR=0.055 Tm
-1 magnetic dipoles with magnetic rigidity HR=0.21 Tm
-12 correcting elements (maximum deviation angle of +/-0.57 degree)
-16 high vacuum turbo molecular pumps and 15 titanium pumps (150l/s). 

 

  • DRIBs-I picture gallery

[ngg_images source=”galleries” container_ids=”16″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”1″ thumbnail_width=”120″ thumbnail_height=”80″ thumbnail_crop=”1″ images_per_page=”12″ number_of_columns=”6″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”1″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] 

<<< back