Home/To the Main Page Search/Search E-Mail
                       
FLNR ACCELERATOR COMPLEXES

    DRIBs-II (Phase #2)


  • DRIBs layout in the FLNR


      DRIBs
                                                                              Click to enlarge


  • DRIBs-II (Phase #2): MT-25 Microtron —> U400

    The ion beam line for transportation of heavy ions (238U-fission fragments) from MT-25 microtron to the U400 cyclotron (R&D stage)


    - 238U-fission fragments
    - Vacuum volume at a pressure of 2•10-7 Torr
    - Ion guide with length of 70 meters with inner diameter of 100 mm
    - Produce target
    - Plasma Ion Source
    - Separator facility
    - ECR ion source
    - 3 quadrupole magnetic lenses with gradient of the magnetic field 0.9 T/m
    - 16 quadrupole magnetic lenses with gradient of the magnetic field 1.7 T/m
    - 6 magnetic dipoles with magnetic rigidity HR=0.21 Tm
    - 6 correcting elements (maximum deviation angle of +/-0.57 degree)
    - 4 high vacuum turbo molecular pumps and 8 titanium pumps (150l/s).


  • <<< back